Freitag, 7. Oktober 2011

EN - What a week!


First week with a new customer is done and it was quite nice. Quite good documented and nice topics I´m working on. Bad luck most stuff is once again CheckPoint but well I´ve got to face it, they won´t go away, so I got to deal with them.

Anyway since I was figuring out processes and stuff I wasn´t able to update my posts here but I think next week I´ll have a little more time for blogging.

DE - Was für eine Woche!


Quasi die erste Woche beim Kunden ist um und ich muss sagen ich bin positiv überrascht. Die meisten Sachen sind gut dokumentiert und / oder selbsterklärend und auch das Bereitstellen der Arbeitsmittel hat fast reibungslos funktioniert. Leider ist der Fokus auch dieses Mal wieder auf CheckPoint, aber da CheckPoint vermutlich nicht so schnell verschwindet, werde ich mich damit arrangieren (müssen).

Auf jeden Fall blieb mir nicht so viel Zeit zum bloggen, da die meiste Zeit zum einlesen und durcharbeiten drauf gegangen ist. Nächste Woche dürfte es besser werden und dann gibt es auch wieder neue Posts.

Dienstag, 4. Oktober 2011

DE – Rack Layout


OK ich hab es also wieder nicht wirklich geschafft meinen Zeitplan treu zu bleiben. Aber da ich mit meiner Familie meine Eltern besuchen war hab ich das verlängerte Wochenende für mehr Zeit mit der Familie und weniger Zeit zum Lernen und Bloggen genutzt.

Wie schon im letzten Post erwähnt, hab ich es geschafft mein Lab fertig zu stellen. 



Anbei eine kleine Auflistung der Sachen die ich jetzt verbaut hab und warum sie sich dort befinden :)

HE 1 & 2 - Patch Panels für die Büro Verkabelung – das Rack wird auch im Produktiven Netz benutzt
HE 3 - Cisco 2509 + Oktopus Kabel + AUI Konverter Der Router arbeitet als Terminal Server für alle Lab Geräte
HE 4 - Cisco 2924 – 24 Port Fast Ethernet Switch, als Backbone Switch übernimmt er die L2 Topologie Anbindung der ASAs
HE5 -6 Neat Patch – Kabelführungsgedönst (sehr schick)
HE7 HP ProCurve Switch (non Lab)
HE8 Cisco ASA (BLUE) –ASA OS 8.0.2
HE9 Cisco ASA (GREEN) –ASA OS 8.0.2
HE10 Cisco ASA (RED) –ASA OS 8.0.4 (wird noch angepasst)

Unter den ASAs befindet sich eine etwas ältere Vostro Workstation von Dell, die so umgebaut wurde, das sie nun als VMware Server für die anderen Systeme dient, sprich für ACS, IOU, GNS3 und natürlich auch für die Client Betriebssysteme

Auf der Rückseite des Racks befindet sich eine achtfach Steckdose, mit IP Anschluss, so dass alle Geräte per Webmanagement hoch und runter gefahren werden können.

Sobald ich Zeit hab update ich meine L1/ L2 Topologie und poste sie hier

So long

EN - Rack layout



Once again I´ve been a bit lazy, we´ve been to my parents and I decided to spent more time with my family than blogging (and learning).

But as mentioned earlier I was finally able to cable my rack.


As you can see (hopefully) I´ve got a mixed rack. This means a small part of the stuff is used for productive networking in our office.

I will quickly line out what I´ve used and why, starting from top.

U 1 & 2 - patch panels for the office (non LAB)
U 3 - Cisco 2509 + octopus cable + AUI converter – this router is used to provide console connections to all lab devices
U4 - Cisco 2924 – 24 Port Fast Ethernet switch, not really part of the lab the switch just provides the L2 Structure for the ASAs
U5 -6 Neat Patch – just to keep the rack clean
U7 HP ProCurve Switch (non Lab)
U8 Cisco ASA (BLUE) – Running ASA OS 8.0.2
U9 Cisco ASA (GREEN) – Running ASA OS 8.0.2
U10 Cisco ASA (RED) – Running ASA OS 8.0.4 (need to fix that)

Below – not rack mounted – Dell Vostro 410 Desktop PC modified to work as VM host system with ACS, IOU , GNS3 and some Guest OS to work as clients.

All Lab equipment is attached to an 8 port power outlet that can be managed using a web interface to remotely reboot the stuff in case it fails.

I´ll update the L1 / L2 topology in the next view days and once again post it here.
So long

Sonntag, 2. Oktober 2011

EN - So many things, so little time


Actually I had planned to post a small update on my CCIE lab the last Thursday, but as usual life or in this case the customer had another opinion about it. 

As mentioned earlier I was working at a customer location to immediately fix some network issues with HP system. After the STP problem was solved we talked a while and decided to move to L3 meaning enabling routing and reducing the spanning tree. Since the customer had special demands considering network outages during business hours we scheduled the redesign and rebuild of the network to Thursday night. Not to mention that it took the whole night after we “crashed” their router (Draytek) so hard that this stupid box didn´t knew that it had interfaces after the reboot. 

At 4 in the morning everything was back up and the network was running smooth (and all switches stayed significant below 20% CPU utilization). Next step will be replacing the Draytek box with two Cisco routers and shifting from copper uplinks to fiber as well as implement QoS. 

So I had about 4 hours to go back home, shower, sleep, wake up, get to the office and prepare for the next customer meeting – no time for blog post. 

Anyway I managed to finally cable my CCIE Security lab rack and will post a few updates about it tonight, hopefully.

DE – viel zu viel zu tun und viel zu wenig Zeit


Eigentlich wollte ich euch am vergangenen Donnerstag berichten wie toll mein CCIE Lab voranschreitet aber leider ist, wie so oft, etwas dazwischen gekommen, in diesem Fall ein Kunde.
Wie schon berichtet, habe ich ja letzten wieder einmal etwas mit HP ProCurves zu tun gehabt. Der Kunde hatte massive Netzwerkprobleme beklagt und wie sich herausstellte, war es unter anderem ein STP Problem, welches sich recht schnell fixen ließ. Nachdem der Fix implementiert war haben wir noch etwas zusammen gesessen und uns dann darauf verständigt, das wir von einer flachen L2 Struktur auf eine L3 Struktur wechseln und so den Spanning Tree massive verkleinern – quasi Bonsai Spanning Tree. Da der Kunde aber den kompletten Umbau der Netztopology nicht unbedingt in die Geschäftszeiten legen wollte, haben wir uns für die vergangene Donnerstagnacht entschieden.

Gesagt getan, die gesamte Nacht haben wir das Netz umgebaut und dabei den Edge Router (einen Draytek) so sehr verwirrt, das er nach einem Reboot nicht mehr seine Interfaces gefunden hatte. Zum Glück konnten wir die Box auf Werkseinstellungen zurücksetzen und ein Backup einspielen. Gegen 4 Uhr war das Netz dann umgestellt und schnurrte wie ein Kätzchen, Yeah! Als nächstes wird die Draytek Box durch ein paar Cisco Router ersetzt und die Uplinks auf Fiber umgestellt. Ach ja QoS soll auch noch kommen, unter anderem.

Danach blieben mir noch gute 4 Stunden um nach Hause zu kommen, zu duschen, zu schlafen, aufzustehen und ins Büro zu kommen für den nächsten Kundentermin. Sprich es blieb keine Zeit mehr für mein CCIE LAB Post übrig.

Egal, egal, egal, ich hab es am Freitag geschafft mein Rack noch fertig zu verkabeln und darüber gibt es hoffentlich heute Nacht ein Post ;)